Just to give everyone a heads up the Town has a couple capital projects which are proposed to take place this construction season, the first will affect residents living and travelling on 51 street, and 51 Ave. Construction will take place from the 4 way stop on 50 street, south-west of the High School around the curve at the seniors housing units and end up by 50 Ave by Burger Bar. Work in this area will include a total replacement of the Sanitary Sewer line, + paving.  The work is necessary as the sanitary line has been in service for close to probably 40 years and has reached the end of its life cycle. The second proposed area of Town is the west end of 47 Ave. The proposed work will include the replacement of the sanitary line from 51 street to approximately half way to 50 street. This line has developed some sags and because of it being shallow causes freezing in the winter time causing back ups for residents.

We would like to thank everyone in advance for your patience and cooperation during construction as we realize construction in front of residents is always somewhat of an inconvenience.