Just to give everyone a heads up the Town has a capital project which is in the last phases of its project.
Construction project #1 – This will affect residents living and travelling on 47th Avenue. This includes the replacement of 100 meters of the sanitary mainline from 51 Street to the midway manhole on 47 Avenue. Crews will try their best, as much as possible, to provide access to residents that live along 47 Avenue, but we do encourage the use of the back lane during the construction. Garbage, recycling, and grass bags can be placed out as usual and collection will be managed by the construction crew.
Tentative Schedule: Updated Sept 9, 2024.
- July 29 – Aug 5 Mobilization and roadway removal
- Aug 5 – Aug 12 Mainline and manhole replacement
- Aug 12 – Aug 26 Service line replacements
- Aug 26 – Sept 13 Concrete repairs, subgrade prep, paving
- Sept 13 – Sept 20 Landscaping and cleanup
We would like to thank everyone in advance for your patience and cooperation during construction as we realize construction in front of residents is always somewhat of an inconvenience.